Uttar Pradesh Expressways Industrial Development Authority

The Uttar Pradesh Expressways Industrial Development Authority (UPEIDA), headquartered at Paryatan Bhawan in Gomti Nagar in Lucknow, is an land acquisition and infrastructure development entity of the Government of Uttar Pradesh aimed at the development of expressway, industrial corridors, and the promotion of investments in the state.

Core functions

UPEIDA was set up in 2007.

Expressways in Uttar Pradesh

List of expressways in Uttar Pradesh, listed north to south, west to east.

A. West to east across the state: approved.

A1. Across Northern Uttar Pradesh: Ludhiana–Bareilly-Gorakhpur–Siliguri direct route, approved.

This includes "Bareilly-Ludhiana Economic Corridor".

A2. Across Upper Central Uttar Pradesh (east to west): Haridwar–Kanpur- Varanasi–Prayagraj route, approved.

A3. Across Lower Central Uttar Pradesh: Delhi–Kanpur–Lucknow–Buxar–Patna direct route, approved.

A4. Across Southern Uttar Pradesh (east to west): Delhi–Agra–Chitrakoot route, approved.

B. Inter-corridors (north to south): approved.

In September 2023 the up government approved 7 North South corridos which will be combination of upgrade of 2000 km brownfield and 600 km greenfield routes. This will bring the cost of logistics down to 10%, which was 15% in 2023. Approved north-south corridors are, Bijnor-Lalitpur, Moradabad-Agra, Pilibhit-Mahoba, Lakhimpur Khiri-Chitrakoot, Gonda-Prayagraj and Basti-Mirzapur.

B1. Kotdwar–Bijnor–Lalitpur route: partially approved.

  • Kotdwar–Bijnor Expressway, greenfield, Kotdwar-Noorpur-Nagina-Anupdhahar to Aligarh, proposed, not yet approved.
  • Bijnor–Lalitpur route, approved in Sept 2023.

B2. Moradabad–Agra–Gwalior–Kota route: Approved.

  • Srinagar–Kashipur in Uttrakhand to Moradabad in UP: existing NH309.
  • Moradabad–Aligarh–Agra route approved in Sept 2023.
  • Aligarh–Agra Expressway (Aligarh-Khandauli Expressway), 65 km long, INR1,620 cr, greenfield, parallel to NH-504, under-construction (2027 completion). Construction will begin in June 2025 in two simultaneous phases, Phase I (Aligarh to Asroi Hathras, 28 km) and Phase II (Asroi Hathras to Khandauli, 37 km) with soil sampling for Phase II to begin in May 2025 and phase-2 constriction will commence soon after (January 2025 update). Expressway will have 1 Rail-Over-Bridge (ROB), 3 road flyovers, and 55 underpasses.
  • Agra-Gwalior Expressway, 88.4 km, INR4612 cr, 6-lane, greenfield, under-construction (2028 completion), construction by GR Infra will begin in October 2025 and will be completed in 30 months by 31 March 2028 (April 2025 update).
  • Atal Progress-Way (Chambal Expressway), Bah-Gwalior-Kota, approved.

B3. Pilibhit–Mahoba route: approved.

Approved in Sept 2023.

B4. Lakhimpur Khiri–Chitrakoot route: approved.

Approved in Sept 2023.

B5. Gonda–Prayagraj route: approved.

Approved in Sept 2023.

B6. Basti–Mirzapur route: approved.

Approved in Sept 2023.

B7. Gorakhpur–Varanasi–Kolkatta route: approved.

C. Inter-corridors (north to south): partially approved or not yet approved.

C1. Baghpat–Gangoh–Yamunanagar–Nahan route with Gangoh–HathiniKund spur: proposed, not yet approved.

  • Baghpat, between Barout–Chhaprauli, Kairana, Gangoh greenfield.
  • Gangoh–Yamuna bridge: on existing Ambala–Shamli Expressway.
  • Yamuna bridge to Yamunanagar, greenfield.
  • Yamunanagar (Bhambholi)–Sadhuraha greenfield,
  • Sadhuraha–KalaAmb–Nahan, upgrade brownfield.

C2. Bareilly–Chandausi–Anupshahar–Bulandshahr–Delhi route: not yet approved.

  • Bareilly–Bulandshahr brownfield upgrade, not yet approved.

C3. Nepal–Bareilly–Jewar–Hodal–Punhana route: not yet approved.

C4. Khatima–Bareilly–Etawah to Gwalior–Kota–Mumbai route: partially approved.

C5. Nepal (Nanpara)–Barabanki–Lucknow–Jhansi route: partially approved.

C6. Shravasti–Gonda–Amethi–Chitrakoot–Satna–Nagpur route: partially approved.

  • Tulsipur–Gonda–Chitrakoot Expressway, greenfield, via Rudauli–Raebareli–Khaga, approved in Sept 2023.
  • Shravasti–Bhinga (border with Nepal) spur, not yet approved.
  • Shravasti–Tulsipur (border with Nepal) spur, not yet approved.
  • Chitrakoot–Satna–Maihar, brownfield upgrade, not yet approved.

C7. Nepal (Birganj)-Gorakhpur–Kanpur–Jhansi route: not yet approved.

C8. Varanasi–Ambikapur–Raigarh–Sonepur–Vishakhapstnam route: not yet approved.

  • Gorakhpur–Varanasi then to Ambikapur–Raigarh–Sonepur and at Sonepur merge with "Nepal (Siddharthnagar)–Kushinagar–Ballia–Buxar–Vishakhapstnam route", greenfield & upgrade of brownfield, proposed, not yet approved.

C9. Nepal (Siddharthnagar)–Kushinagar–Ballia–Buxar–Vishakhapstnam route: not yet approved.

D. Circular expressways around Delhi

See also

References

External links