The M4, officially referred to as the M4 Kadñköy - Sabiha Gökçen Airport metro line (), is a , 23-station rapid transit line of the Istanbul Metro. It is colored deep pink on the maps and route signs. Running between Kadñköy and Sabiha Gökçen Airport, it is the first rapid transit line operating on the Asian side of Istanbul. The M4 mostly runs under State road D100, parallel to the Istanbul-Ankara railway and is entirely underground.
A plan to build a subway line on the Asian side of ðstanbul was approved in 2005. In 2008, a 751 million construction contract was awarded to a consortium of Astaldi, Makyol and Gülermak. The rolling stock was ordered from the Spanish company CAF. In mid-2010, the construction of the tunnels was completed and the track laying started. The route has connections with TCDD's Marmaray system at Ayrñlñkçeà Âmesi and the Istanbul Metrobus system at ÃÂnalan. The scheduled opening date was December 2011 up to Kartal, but it was postponed because of signalization works.
The M4 opened on 17 August 2012 with a large ceremony in Kadñköy, attended by Prime Minister Recep Tayyip ErdoÃÂan. On 29 October 2013, with the opening of Marmaray rail service under the Bosphorus, Ayrñlñk ÃÂeà Âmesi station was opened to allow passengers to transfer between lines. On 10 October 2016, 3 new stations were added to the line (Yakacñk Station, Pendik Station and Tavà Âantepe Station). On 2 October 2022, 4 new station were added to the line (Fevzi ÃÂakmak Station, Yayalar Station, Kurtköy Station and Sabiha Gökçen Airport Station). Thus, the length of the line reached 33.5 km.
The addition of 100 new vehicles to the Kadñköy-Sabiha Gökçen Airport metro line fleet is undertaken by Bozankaya.
The M4 has a total of 23 stations in operation, with 6 more under construction.
The stations Kadñköy, Ayrñlñkçeà Âmesi, ÃÂnalan and Göztepe are situated below sea level. The average distance between the stations is . The distance between the stations at Maltepe and Huzurevi is the shortest at . The distance between Bostancñ and Küçükyalñ is the longest with . The Operation Control Center of the line is situated in Esenkent and the depot is located in Maltepe. Another depot is to be built in Kaynarca when the line extends there .
Train frequency is currently every 5 minutes during peak hours and technically could be shortened to 90 seconds. Trains remain at stations for an average of 15 seconds. Four-car trains have a 1,309 passenger capacity and eight-car trains have 2,618 capacity. Ridership capacity in one direction is 70,000 passengers hourly. Total travel time of the entire line is around 52 minutes.
M4 is operated by CAF trains (144 cars in total) every 5 minutes during peak hours. The frequency is much less on weekends and during off-peak hours.