The Istanbul Metro () is a rapid transit railway network that serves the city of Istanbul, Turkey. Apart from the M11 line, which is operated by TCDD Taà Âñmacñlñk, the system is operated by Metro Istanbul, a public enterprise controlled by the Istanbul Metropolitan Municipality. The oldest section of the metro is the M1 line, which opened on 3 September 1989. As of 2024, the system now includes 160 stations in service, with 36 more under construction. With 243.3 kilometers, Istanbul has the 21st longest metro system in the world and the 4th longest in Europe as of 2024.
The system consists of eleven lines: the lines designated M1A, M1B, M2, M3, M6, M7, M9 and M11 are on the European side of the Bosporus, while lines M4, M5 and M8 are on the Asian side. Due to Istanbul's unique geography and the depth of the Bosporus strait which divides the city, the European and Asian metro networks do not connect directly. The two parts of the city are linked through the Marmaray commuter rail line, which is connected to the metro in several places. Four metro lines are under construction on the Asian side: M10 (Pendik MerkezâÂÂFevzi ÃÂakmak), M12 (60. Yñl ParkñâÂÂKazñm Karabekir), M13 (EmekâÂÂYenidoÃÂan) and M14 (AltunizadeâÂÂBosna Bulvarñ). Additionally, extension works on the M7 and M11 lines (on the European side) and the M4 and M5 lines (on the Asian side) are underway.
In addition to the Marmaray commuter rail, the metro connects to the F1, Tünel (F2), F3 and F4 funicular lines and with the network of the Istanbul Tram, Metrobüs and the cable cars.
The oldest underground urban rail line in Istanbul is the Tünel, which entered service on 17 January 1875. It is the world's second-oldest underground urban rail line after the London Underground which was built in 1863, and the first underground urban rail line in continental Europe, however this is not recognised as the opening of the metro due to the line being Funicular.
The first master plan for a full metro network in Istanbul, titled Avant Projet d'un Métropolitain àConstantinople and conceived by the French engineer L. Guerby, dates to 10 January 1912. The plan comprised a total of 24 stations between the Topkapñ and à Âià Âli districts and included a connection through the Golden Horn. Each station would have a platform next to the rail line, while the distance between stations varied from . The blueprints of the project, which was never realized, are today displayed at the Istanbul Technical University Museum.
In 1936 the French urban planner Henri Prost proposed a metro network between the districts of Taksim and Beyazñt, to the north and south of the Golden Horn, respectively. In October 1951 the Dutch firm Nedeco proposed a similar route between Taksim and Beyazñt, and in September 1952 the Director of the Paris Transportation Department, Marc Langevin, prepared a 14-chapter report together with his associate Louis Meizzonet for the implementation of the project and its integration with the other means of public transportation in the city. However, these plans never came into effect and all proposals were put on hold until 1987, when the planning for the current Istanbul Metro was made.
Construction works for the first 'modern' mass transit railway system started in 1989, with the first stations opening in September. ðstanbul Ulaà Âñm A.à Â. (now known as Metro Istanbul) was founded the previous year to operate the system. The M1 was initially called "Hafif Metro" (which literally translates as "light metro"). Although it was built as a fully grade separated line, the M1 line operates with shorter trainsets and shorter station platforms than is standard on a traditional metro line, hence its "light metro" designation. The M1 line was later extended from Aksaray towards the western suburbs, reaching Atatürk Airport in the southwest in 2002.
Construction of the M2 line began on 11 September 1992, but faced many challenges due to the numerous archaeological sites that were discovered during the drilling process, which slowed down or fully stopped the construction of many stations, especially in the south. Taking into account the seismic activity in Istanbul, the entire network was built with the cut-and-cover method to withstand an earthquake of up to 9.0 on the Richter magnitude scale.
The first section between Taksim and 4. Levent entered service, after some delays, on 16 September 2000. This line is long and has 6 stations, which all look similar but are in different colours. In 2000, there were 8 Alstom-built 4-car train sets in service, which ran every 5 minutes on average and transported 130,000 passengers daily. On 30 January 2009, the first train sets built by Eurotem entered service. Eurotem will build a total of 92 new trainsets for the M2 line. As of 30 January 2009, a total of 34 trainsets, each with 4 cars, were being used on the M2 line. A northern extension from 4. Levent to Maslak was opened on 30 January 2009. On 2 September 2010, the northern (temporary) terminus of Darüà Âà Âafaka followed up. The southern extension of the M2 line from Taksim to Yenikapñ, across the Golden Horn with Haliç station on the bridge and underground through the historic peninsula, entered service on 15 February 2014. The Taksim-Yenikapñ extension is long, with four stations. The total cost of the extension was $593 million. At Yenikapñ, it will intersect with the extended M1 line and the Marmaray commuter line, which since its opening in 2013 has offered a connection between the Asian and European sides of the city.
The trip between the à Âià Âhane station in BeyoÃÂlu and the Haciosman station in Maslak is long and takes 27 minutes; including à Âià Âhane - Taksim (, 2 minutes), Taksim - 4. Levent (, 12 minutes), and 4. Levent - Haciosman (, 12 minutes.) The total length of the European side of the M2 line will reach when all 16 stations from Hacñosman to Yenikapñ will be completed; not including the -long Golden Horn Metro Bridge, the long Taksim-Kabataà  tunnel connection with the Seabus port, and the long Yenikapñ-Aksaray tunnel connecting the M1 line to the Yenikapñ Transfer Center.
On the Asian side, construction is in progress of the remaining portion of the long M4 line from Kadñköy to Kaynarca, yielding a total of 19 stations. It cost â¬751 million and was built by the Astaldi / Makyol / Gülermak consortium. The first section opened on 17 August 2012, terminating in Kartal. Construction of the long M5 line from ÃÂsküdar via ÃÂmraniye to ÃÂekmeköy started in March 2012.
The Metro operates from 06:00 AM to 12 AM every 6âÂÂ12 minutes, except for the M8 line, which temporarily operates from 06:00 AM to 23:00 PM. During peak hours, the intervals could be reduced to 3 to 4 minutes.
The metro has a flat fare of 40 TL, a student rate of 20.08 TL, and a fare of 25.06 TL for teachers and senior residents, when used with the Istanbulkart, the city's universal contactless payment card.
On 30 August 2019 as a gesture for the Victory Day of Turkey, Mayor of Istanbul, Ekrem ðmamoÃÂlu, announced that many lines of Istanbul were going to provide 24 hours service during the weekends with trains at 20 minutes interval. Since August 2019, the Istanbul Metro started to provide 24 hours service for some lines on weekends and public holidays, but this service was discontinued in March 2020 due to coronavirus pandemic. On 5 March 2022 Metro Istanbul announced that the night metro service would be re-started on the following lines: M1A Yenikapñ-Atatürk Airport, M1B Yenikapñ-Kirazli, M2 Yenikapñ-Hacñosman, M4 Kadñköy-Sabiha Gökçen Airport, M5 ÃÂsküdar-ÃÂekmeköy, and M6 Levent-BoÃÂaziçi University/Hisarüstü, and later added M7 Mecidiyeköy-Mahmutbey on 14 July 2022.
Each line is given a different color and name. The letter "M" stands for metro, while "T" stands for tram, "F" stands for funicular, "TF" stands for cable car and "B" for suburban. Frutiger LT Pro is used as the font for the icons.
The Istanbul Metro system has a total of 159 stations in operation with 35 more under construction. Since the majority of the system is underground, stations are generally accessed going down from street level. At every station entrance there is a post with the Istanbul metro "M" logo and the station name underneath it except for the M11 line which has the "U" logo next to its own entrances. Entrances are usually built into sidewalks along a street, although many stations of newer lines have their entrances from street level on small plazas.
Like Moscow Metro, the majority of the stations of the Istanbul Metro are generally deep level due to the city's hilly geography.
Out of the 159 operating stations of the Istanbul Metro:
Most stations have a mezzanine directly below street level, which allows passengers to enter the stations from multiple locations and proceed to the correct platform without having to cross any streets. Inside the mezzanines are ticket machines and turnstiles, where passengers must pay to enter fare control zones and proceed to the trains.
In some stations, mezzanines connect directly to nearby buildings and structures, such as shopping malls or business centres. Each station concourse or mezzanine are patrolled by Istanbul Metro security guards to prevent fare evasion and crime.
Stations with large walkways toward different exits, such as Taksim, also have travelators to cover the long walking distances.
Upon entering the station, passengers may use ticket vending machines or staffed ticket booths to purchase their fare, which can be stored on the Istanbulkart contactless smart card. After entering the fare-controlled area, via the turnstiles, passengers may continue further down to the platform level.
Since the different lines of the Istanbul Metro have different specifications, most notably car length, there is no uniform length for platforms. The oldest platforms of the network, built between 1989 and 2002 on the M1 line, are and can accommodate trains up to 4 cars long. Platforms on the M2, M3, M4, M7 and M11 lines span about and can each accommodate trains up to 8 cars long. Platforms on the M5 line can accommodate up to 6-car trains, whiles platforms on the M6, M8, and M9 lines are accommodate 4-car trains.
Sections of platforms are subject to close during off-peak hours, especially on the M2 line. While platforms on the M2 line are open fully during peak hours, capacity is reduced to 4-car trains during off-peak hours. Platforms on the M5, M7, M8 and M11 lines are protected by platform edge doors. Except on funicular lines, most platforms of the Istanbul Metro consist of two side platforms or one island platform. Five stations consist of two island platforms, serving three tracks in a configuration known as the Spanish Solution. These stations are Otogar on the M1 line, Yenikapñ and Sanayi on the M2 line, Olimpiyat on the M9 line, and Bostancñ on the M4 line.
The stations on the M1 line, which were built in the 1980s and 1990s, are very functional and plain in design. Like many stations built during this period, the stations use fluorescent tubes as light sources, and are decorated with tiled floors and ceiling panels made of white plastic ceiling slats. Platforms of stations on the M1 line are supported by square and tiled central columns (e.g. Aksaray, Emniyet - Fatih and Topkapñ - Ulubatlñ.)
Stations on the M2 line built between 2000 and 2011, care was taken to use light colors. For this reason, the basic wall color of the stations is white. In order to make people not confuse the stations and to make them more memorable, some characteristic patterns were also implemented. (e.g. colored stripes/tiles on walls).
Stations on the M7 line, which were built between 2017 and 2020, mostly use a combination of gray and white colors. Since the line has fully automated driverless vehicles, passengers are prevented from falling onto the tracks by using platform screen doors (PSDs).
This table lists technical characteristics of the metro lines that are currently in service or under construction.
Apart from the Haliç station on the M2 line, about half of the M1 (mostly M1A) line, Alibeyköy and KaÃÂñthane valleys crossing by the M7 line, viaduct section at Menekà Âe River of the M3 line and viaduct section at Olimpiyat of the M9 line, the lines are fully underground. All station names are on the bus lines as well.
The M2 line has an interchange between F1 in Taksim and an interchange tunnel with the Zincirlikuyu Metrobus station at the Gayrettepe station. There is also a transfer station at Yenikapñ with Marmaray, M1 line and ðDO Ferry Port; from where it is possible to take the high-speed catamaran Seabus departing for Bursa, Bandñrma or Yalova; as well as the other Seabus ports of Istanbul such as Bostancñ, Kadñköy, Bakñrköy and Kabataà Â.
The M3 line has an interchange with the M9 line at the ðkitelli Sanayi station, M7 line at Mahmutbey station, M1 line at Kirazlñ station, M2, M1 and Metrobus at ðncirli station, and lastly Marmaray (B1) and YHT at ÃÂzgürlük Meydanñ station.
The M4 line has a vapur (traditional ferry), motorboat, ðDO and nostalgic tram interchange at Kadñköy which is the heart of Istanbul's Asian side. One can also interchange to Marmaray at the Ayrñlñk Ceà Âmesi station. Also at ÃÂnalan / Uzunçayñr, the line has a Metrobus interchange just like Gayrettepe in M2.
The M5 line has an interchange with the Marmaray and ðDO at ÃÂsküdar station. At Altunizade the line has a Metrobus interchange. It has an interchange with the M8 line at Dudullu station.
The M6 line has an interchange with the M2 line at the Levent station.
The M7 line interchanges with the M2 line at the Mecidiyeköy station, with the T4 tramway line at the Kiptaà Â-Venezia/Karadeniz station, and with the M3 at the Mahmutbey station.
The M8 line has an interchange with the Marmaray at the Bostancñ station, with the M4 line at the KozyataÃÂñ station and with the M5 line at the Dudullu station.
The M9 has an interchange with the M3 at Ikitelli station, with the M1A line at Yenibosna station and Marmaray (B1) at Ataköy station.
The M11 line interchanges with the M2 line and Metrobus at Gayrettepe station, and with the M7 line at KaÃÂñthane station.
Aside from running on standard gauge tracks and all models having 4 doors per side, the rolling stock is generally incompatible, with few track connections to other lines and rolling stock generally will never run on any line other than whatever they first were delivered to. As each line is generally self-contained, this has rarely become an issue.
The first Istanbul full metro rolling stocks, which entered service on 16 September 2000, on the Taksim - 4. Levent line, were built by Alstom. These trains are air-conditioned and equipped with LCD screens, and share a similar exterior design to the first three generations of rolling stock used on the Caracas Metro in Venezuela.
On 30 January 2009, the first 8 trains (each with 4 wagons) built by Eurotem (the Turkish factory of Hyundai Rotem) entered service. Today the system has 268 trains. These trains are also air conditioned and equipped with LCD screens, as well as dynamic route map showing the location and direction of the train.
In September 2009, CAF signed a contract to supply 144 units for the M4 metro line, amounting to 1.1 million euros. These metro units are formed with 4 cars for a total length of 90 meters and have a maximum transport capacity of 1300 passengers.
In August 2013, tender for the 126 driverless train units for the M5 line was won by CAF and Mitsubishi with 119 million euros. The first units were delivered in November 2016.
In March 2016, Eurotem signed a contract to supply 300 driverless units for the M7 line, amounting to 280.200.000 euros.
Although line M1 is a (light) metro line, its rolling stockâÂÂin use since 1989âÂÂis made up of typical ABB light rail vehicles (LRVs). These are partly the same as those used on the T4 tramway line. The rolling stock of the line is planned to be refurbished and made driverless.
The rolling stock on the M2 and M6 lines, which totals a number of 192 units, is made up of Alstom vehicles from France and Hyundai Rotem vehicles from South Korea which are manufactured in Adapazarñ by Eurotem. All wagons have 8 double doors, making them have 4 openings on each side per wagon, the rolling stock also includes a fast passenger change, heating, air conditioning and broadcasting system. These lines are the only lines to use third rail power.
The rolling stock on the M3 line, consists of 68 Alstom Metropolis AM4 (similar-looking vehicles are used at M4 Budapest Metro) units. Some of them are also used on the M9 Ataköy-Olimpiyat metro line.
Line M4 uses CAF rolling stock. Trains operate in 4-car sets and can couple to form 8-car trains.
Line M5 uses driverless 6-car CAF rolling stock.
Line M7 uses driverless Hyundai Rotem rolling stock. Trains are made of 4-car units and can couple to form 8-car trains, although these are not currently used. Line M8 uses very similar trains, but only as 4-car sets.
Line M11 uses CRRC rolling stock.
As part of the Istanbul Metropolitan Municipality goal of expanding the size of the city rail transportation network to by 2030, the Istanbul Metro has several lines that are under construction or planned. Since the city does not have a widespread railway network, the Metropolitan Municipality aims to connect urban areas of the city that do not have access to the Istanbul two coastal railways with metro lines.
Due to the city's unique geography and depth of the Bosporus which divides the city, none of the current Istanbul Metro lines cross the strait; lines are wholly located either on the European side or the Asian side of the city. In 2019, The Ministry of Transport and Infrastructure began the planning of a line that would link ðncirli with SöÃÂütlüçeà Âme via a tunnel under the Bosphorus also designed to accommodate road traffic.
The following metro lines are under construction:
Construction of the following metro lines are planned or on hold:
The M7 Kabataà Â-Yñldñz metro line extension is under construction. The extension will have 2 new stations and is expected to go into service in 2028. It will interconnect with ferries at Beà Âiktaà  and Kabataà  stations, with T1 trams line at Kabataà  station and with F1 funicular line at Kabataà  station.
The M11 Gayrettepe-Arnavutköy Hastane metro extension to Halkalñ is under construction. The extension from Arnavutköy Hastane to Halkalñ will be opened in early 2026.
M4 KadñköyâÂÂðçmeler Metro Line is extending to ðçmeler. Planned opening date of Kaynarca Merkez is early 2027. Construction between Kaynarca Merkez and ðçmeler has not started yet.
M5 ÃÂsküdarâÂÂÃÂekmeköy-Sultanbeyli Metro Line was being extended a tender signed in April 2017 but construction was restarted in November 2019. The section between ÃÂekmeköy and Samandñra Merkez opened on 16 March 2024 and the remaining section to Sultanbeyli is expected to open in 2026.
The M12 60. Yñl Parkñ-Kazñm Karabekir Metro Line will connect the underserved Ataà Âehir district with the regional centres of densely populated ÃÂmraniye and integrate those districts into the Istanbul rapid rail system. Planned opening date is 2026.
The M14 Altunizade-Bosna Bulvarñ Metro Line will serve the ÃÂamlñca Hill, ÃÂamlñca Mosque and Bosna Boulevard and will be connect the M5 metro line. Planned opening date is 2026.
Metro, suburban rail, tram, funicular, ropeway and Metrobus (as of March 2024):