List of Hyderabad Metro stations

This is the list of stations of the Hyderabad Metro, a rapid transit system serving the city of Hyderabad in Telangana, India. , there are 57 metro stations in the network, which were completed and operational as a part of Phase I, making it the third longest operational metro network in India after Delhi Metro and Namma Metro of Bengaluru.

Prime Minister Narendra Modi inaugurated the Hyderabad Metro on 29 November 2017 by opening a 30 km stretch from Miyapur to Nagole, making it the longest stretch commissioned in the first phase among all metros in India. It has since been expanded to around of route length. The system is operated by the Hyderabad Metro Rail Limited (HMRL). Stations display signboards in Telugu, English, Hindi and Urdu. All stations of Hyderabad Metro Rail are equipped with a tactile pathway from street level to the platform level, along with elevator buttons equipped with Braille, for providing barrier-less navigation for visually impaired commuters.

Each line of the Hyderabad Metro is identified by a specific colour. The system uses rolling stock of standard gauge and has elevated lines. The Metro is open from about 06:30 to 22:30 hours, with trains operating at a frequency of 3.5 to 6.5 minutes with SelTrac communications-based train control (CBTC) and integrated telecommunication and supervision systems that allow an unattended train operation. , Hyderabad Metro had an average daily ridership of around 475,000. The Red Line connects Miyapur to the north and LB Nagar to the south, while the Blue Line connects HITEC City to the west and Nagole to the east.

Stations

Lines

Since the first version of the plans, the three corridors mostly remained the same, but minor changes were introduced. These include the lack of stop at Lalaguda, or a stop at Lakdikapul instead of Secretariat. Also, the lines have been marked with several different combinations of color. Ameerpet- LB Nagar metro stretch opened on 24 September 2018. HiTec City to Raidurg, stretch on Corridor Three - Nagole to Raidurg, was opened on 29 November 2019, as it involves construction of 49 pillars and the Raidurg terminal station.

<span style="color:Red;">Red Line</span>: Miyapur–L.B. Nagar

Route length – <br /> Number of stations (all elevated) – 27<br /> Link to other corridors

<span style="color:Green;">Green Line</span>: JBS–MGBS

Route length – <br /> Number of stations (all elevated) – 10<br /> Link to other corridors

<span style="color:Blue;">Blue Line</span>: Raidurg-Nagole

Route length – <br /> Number of stations (all elevated) – 23<br /> Link to other corridors

  • At Ameerpet – connecting corridors 3 and 1
  • At Parade Ground – connecting corridors 3 and 2

Phase 2 Metro stations and lines

Part A

<span style="color:Purple;">Corridor IV</span>: Nagole- RGIA

Also known as the to Rajiv Gandhi International Airport

Map

<noinclude>

Interchanges

Passenger interchange facilities, connecting to other metro and railway lines, are provided at the following stations:

Route length – <br /> Number of stations (all elevated) – 24<br />

<span style="color:Blue;">Blue Line Extension</span>: Raidurg-Kokapet Neopolis

Route length – <br /> Number of stations (all elevated) – 11<br />

Map

Intercharges

  • At Raidurg - connecting corridors 1

<span style="color:Red;">Red Line Extension</span>: Miyapur-Patancheruvu

Map

Intercharges

  • At Miyapur - connecting corridors 3

Route length – <br /> Number of stations (all elevated) – 11<br />

<span style="color:Red;">Red Line Extension</span>: LB Nagar-Hayathnagar Khalsa

Route length – <br /> Number of stations (all elevated) – 7<br />

Intercharges

  • At LB Nagar – connecting corridors 3 and 4

<span style="color:Green;">Green Line Extension</span>: MGBS-Chandrayangutta

Earlier in 2010, All India Majlis-e-Ittehadul Muslimeen suggested an alternate route for the metro in the old city through Purana pul, Muslimjung, Bahadurpura, Zoo Park, Tadbun junction, Kalapathar, Misrigunj and Shamsheergunj to Falaknuma. However, this 7.4 kilometres (4.6 mi) route was not accepted. The eastern parts of the old city have access to the metro via the Malakpet metro station. A 5.5 kilometres (3.4 mi)-long green line in the old city will pass through Dar-ul-Shifa, Salar Jung Museum, Charminar, Shah-Ali-Banda, Shamsheer Gunj, and Jungametta, and end at Falaknuma. In June 2022, Hyderabad Metro Rail started a fresh survey of the Old City route from MGBS for underground utilities. The survey is through the Lidar, Global Positioning System and inertial measurement unit and the plan is to build the elevated line alongside Musi river and center of the road. In July 2023, Telangana Chief minister K. Chandrashekar Rao instructed the municipal administration and L&T chairman to take forward the metro project in the old city. On 16 July 2023, Hyderabad Metro MD NVS Reddy stated that preparatory works for taking up Metro Rail works in the old city had started and land acquisition notices for 1,100 affected properties would be issued in about a month. All the five metro stations in the old city were to have 120-feet wide roads under the viaduct. On 27 August 2023, Hyderabad Metro Rail Limited started a drone survey of the proposed rail alignment in the old city.

Route length – <br /> Number of stations (all elevated) – 8<br />