The Vader Piet Wind Farm is a wind farm in Aruba. It is the first wind farm in the territory.
The establishment of the wind farm was proposed in February 2008. The wind farm was then commissioned in December 2009, making it the first wind farm in Aruba.
The wind farm has an installed capacity of 30 MW, which consists of ten units of 3.0 MW turbines. Each wind turbine tower stands at a height of 80 m.
The wind farm was constructed at a cost of US$75 million.