NUKEM Technologies GmbHï¼Âbranded as NUKEMï¼Âis a German nuclear engineering company based in Karlstein am Main, with a history dating back to 1960. The company specializes in nuclear decommissioning, radioactive waste management, spent fuel handling, and the development of TRISO fuel technology.
Its headquarters sit on the site of GermanyâÂÂs first nuclear power plantâÂÂa facility that NUKEM itself decommissioned and restoredâÂÂhighlighting the companyâÂÂs long-standing role in the countryâÂÂs nuclear sector.
Following several changes in ownership over the decades, NUKEM faced increasing regulatory challenges after the start of the Russia-Ukraine war in 2022 due to its Russian ownership at the time. In April 2024, the company filed for bankruptcy in Germany. In October of the same year Muroosystems Corporation, a Japanese Company, acquired its core assets, enabling NUKEM to resume operations and re-enter the global market under new leadership.
NUKEM Technologies traces its origins to 1960, when NUKEM GmbH (originally Nuklearchemie und -metallurgie GmbH) was established through a joint investment by Degussa, Rio Tinto, and Mallinckrodt. The company initially focused on nuclear fuel element production and trade, quickly becoming one of EuropeâÂÂs leading suppliers in the nuclear fuel market.
In 1969, NUKEM sold its light water reactor fuel business to KWU (a joint venture between Siemens and AEG), marking a strategic shift toward uranium trading, nuclear waste management, and engineering services. By the mid-1980s, NUKEM was engaged in front-end and back-end nuclear cycle services and took part in the Wackersdorf reprocessing plant project in Germany, an effort to advance spent fuel recycling. However, due to public opposition and shifting political priorities, the project was canceled in 1989, limiting NUKEMâÂÂs expansion in reprocessing technologies.
In 1988, NUKEM became a wholly owned subsidiary of RWE AG, one of GermanyâÂÂs largest energy utilities. Under RWE, NUKEM expanded its integrated nuclear services, combining fuel supply, waste management, and engineering capabilities to strengthen its market position across Europe.
During the 1990s and early 2000s, NUKEM began to grow its international footprint, securing contracts for waste management and engineering services at nuclear sites in Slovakia (Bohunice), Russia (Balakovo), and Ukraine (Khmelnytskyi). In 2003, NUKEM launched the construction of a waste treatment center at the Chernobyl Nuclear Power Plant, enhancing its presence in high-activity waste processing and establishing itself as a global player in complex nuclear remediation projects.
In 2006, RWE sold NUKEM to Advent International (via Advent Energy S.àr.l.) for â¬205 million. Following the acquisition, Advent International restructured NUKEM GmbH, retaining the nuclear fuel trade business under the parent company while spinning off its radioactive waste management, spent fuel management, and nuclear decommissioning engineering operations into an independent nuclear engineering subsidiary, NUKEM Technologies GmbH.
In 2007, NUKEM divested several subsidiaries: NUKEM Ltd. (UK) to Freyssinet SAS (VINCI Group), NUKEM Corp. (USA) to EnergySolutions, and NIS Ingenieure (Germany) and Assistance Nucléaire S.A. (France) to Siempelkamp. In 2011, RWE spun off the isotope trading business into NUKEM Isotopes GmbH. In 2012, the nuclear fuel trade division NUKEM Energy GmbH was sold to Cameco for $136 million.
On December 14, 2009, NUKEM Technologies GmbH was acquired by Atomstroyexport, a subsidiary of RussiaâÂÂs Rosatom, for â¬23.5 million. The company was subsequently integrated into the Rosatom Group as part of RussiaâÂÂs strategic expansion in nuclear decommissioning and waste management.
To strengthen its operational capabilities in these areas, NUKEM established a new subsidiary in 2014, NUKEM Technologies Engineering Services GmbH, focused exclusively on nuclear facility decommissioning, radioactive waste treatment, and related engineering services.
Following the outbreak of the Russia-Ukraine war in 2022, NUKEMâÂÂs operations in European markets came under severe pressure due to its Russian ownership. As regulatory restrictions mounted and projects were suspended, the company experienced a significant downturn in business. In April 2024, NUKEM filed for self-administered insolvency in Germany.
On May 29, 2024, JapanâÂÂs Muroosystems Corporation signed an agreement with NUKEMâÂÂs insolvency administrator to acquire all shares of NUKEM Technologies Engineering Services GmbH, along with core assets from NUKEM Technologies GmbH. The German government approved the transaction on September 9, with economic ownership officially transferred on September 25, and the full acquisition finalized in October 2024.
Following the sale, NUKEM Technologies GmbH was liquidated in December 2024, and its remaining operations and intellectual property were fully consolidated into the restructured NUKEM Technologies Engineering Services GmbH, now operating under Muroosystemsâ ownership. The acquisition allowed the NUKEM brand and its core business to continue, with support from its new parent company driving renewed efforts to strengthen and expand its presence in the global nuclear engineering market.
NUKEM Technologies has delivered a wide range of high-impact international projects across the nuclear lifecycle, including facility decommissioning, radioactive waste management, spent fuel storage, and advanced fuel technologies. Its global project portfolio demonstrates both technical depth and operational versatility:
⢠Lithuania: Designed and constructed interim spent fuel storage and solid waste treatment facilities for the Ignalina Nuclear Power Plant, supporting LithuaniaâÂÂs broader decommissioning strategy.
⢠South Africa: Awarded a contract in 2007 to design and supply a pilot fuel plant for the countryâÂÂs Pebble Bed Modular Reactor (PBMR) program. Although the project was later cancelled, it highlighted NUKEMâÂÂs capabilities in advanced fuel systems.
⢠Indonesia: In 2015, NUKEM collaborated with local companies to carry out early-stage design and feasibility work for a 10 MW high-temperature gas-cooled reactor (HTGR) experimental facility commissioned by IndonesiaâÂÂs National Nuclear Energy Agency (Batan).
⢠Bulgaria: Built a dry spent fuel storage facility for the Kozloduy Nuclear Power Plant, enhancing BulgariaâÂÂs long-term spent fuel management infrastructure.
⢠Russia: Provided waste treatment and conditioning facilities at the Leningrad and Kursk nuclear power plants, contributing to RussiaâÂÂs national radioactive waste handling capacity.
⢠Ukraine: Developed and delivered a solid waste management complex at the Chernobyl Nuclear Power Plant.
⢠France: Led the dismantling of the reactor block at the Brennilis Nuclear Power Plant, as part of FranceâÂÂs nuclear decommissioning program.
⢠China: Supplied process equipment and services for a spent ion exchange resin treatment facility at the Zhangzhou Nuclear Power Plant, including design, engineering, fabrication, testing, and QA, reinforcing ChinaâÂÂs waste treatment infrastructure.
⢠Switzerland: Conducted pre-dismantling feasibility studies at the Mühleberg Nuclear Power Plant, evaluating the application of the FREMES system for characterizing radioactive concrete debris.
⢠Sweden: In partnership with Uniper Nuclear Services GmbH, successfully completed the dismantling of the last reactor pressure vessel at the Oskarshamn Nuclear Power Plant, contributing to SwedenâÂÂs national decommissioning progress.
These projects underscore NUKEMâÂÂs long-standing experience in nuclear decommissioning, radioactive waste management, spent fuel handling, and fuel cycle technology, affirming its role as a trusted partner in the global nuclear engineering sector.