Three Cedars Solar Project is a 210&nbsp;MW<sub>AC</sub> (265&nbsp;MW<sub>p</sub>) photovoltaic power station consisting of three units extending about 15 miles northwest of Cedar City, Utah. The project was developed by SunEdison, built with its global team of partners, and commissioned in September 2016. The electricity and renewable energy credits are being sold to Rocky Mountain Power under three separate 20-year power purchase agreements.

Project details

The project consists of three separate units distributed on private land along the headwaters of Iron Springs Creek at a sunny and cool elevation near 6,000&nbsp;feet.

Planning was initiated by the independent renewable energy developer First Wind (founded 2002) which began expanding into photovoltaic energy around 2012. First Wind and its extensive portfolio of assets in western Utah were acquired by SunEdison and its TerraForm Power yield co in November 2014. Beginning construction at the time was the 20.2&nbsp;MW Seven Sisters Project, a dispersed set of ~3&nbsp;MW facilities throughout Beaver and Iron counties.

To finance the construction of Three Cedars, SunEdison entered into a joint venture with Dominion Resources. The resulting entity, Dominion Renewable Energy, utilized $80&nbsp;million from SunEdison and $320&nbsp;million from Dominion to start construction in September 2015. The two companies also previously entered a joint venture to construct the 320&nbsp;MW Four Brothers Project, which includes the three co-located 80&nbsp;MW Escalante units in Beaver County and the 80&nbsp;MW Enterprise unit in Iron County, on about the same timeline.

Construction of Three Cedars progressed simultaneously at all three sites, created an estimated 250 local construction jobs, and was completed by October 2016. Along with the electricity to power more than 36,000 homes, it is expected to produce $17 million in property and income taxes for the region over 20 years. The project is operated and maintained by Swinerton Renewable Energy.

SunEdison filed for Chapter&nbsp;11 bankruptcy protection on April 21, 2016, but was able to complete the project on time with its receipt of $300&nbsp;million in bankruptcy debt financing. On September 13, 2016, the company was forced to sell its stake in the completed facilities in a fire sale. NRG Energy was the successful bidder.