The Taishir Hydro Power Station () is a hydroelectric power station in Taishir, Govi-Altai Province, Mongolia.
The power station was commissioned in 2008.
The water intake for the power station comes from Gegeen Lake. The power station has an installed capacity of 11 MW.
The power station and its dam was constructed with a cost of US$39 million. It was funded by Kuwait Fund for Arab Economic Development and the United Arab Emirates.