Shaheding Station () is a station of Guangzhou Metro Line 6. It is located underground in Tianhe District. It started operation on 28 December 2013.
The station has 2 points of entry/exit, with Exit A being accessible via stairlift.
The station was originally named Shuiyin Road station at the beginning of Line 6 planning, and was later officially named Shaheding.
Due to the impact of the site environment and the demolition of Guangdong University of Technology, the station plan has been adjusted twice. On 22 October 2010, the main structure of the station was topped out. On 26 December 2012, the section between this station and Huanghuagang Station was bored through.
On 28 December 2013, the station was put into use with the opening of Line 6 trial operation.