The Serven Solar Power Plant is a photovoltaic power station in Altai City, Govi-Altai Province, Mongolia.
The project to construct the power plant was approved in September 2018. The power plant was commissioned in 2023 in an inaugural ceremony held on 3 September 2023 attended by Prime Minister Luvsannamsrain Oyun-Erdene.
The power plant has an installed generation capacity of 10 MW. It generates 20 GWh of energy annually.
The power plant was constructed with a cost of US$10.4 million. It was funded by loan from the Asian Development Bank and co-financed by the Strategic Climate Fund and Joint Crediting Mechanism.