Ragigudda - Silk Board Flyover is a partially opened rail-cum-road flyover in the city of Bengaluru in Karnataka, India. It is the first double decker flyover in Bengaluru, which is being built by the Bangalore Metro Rail Corporation Limited between and metro stations as part of the Yellow Line (Rashtreeya Vidyalaya Road-Delta Electronics Bommasandra). After completion, it will become the first rail-cum-road flyover in South India, which is expected to be completed by 2026.
The flyover has two levels above ground, with the first level having four lanes for carrying vehicles while the second level carries the metro tracks. The total length of the flyover is 3.2 kilometres long. At 31 metres tall, it is tallest rail-cum-road flyover in South India.