Ahvaz Pol Hashtom or Pol-Kabli () known as Qadir Bridge, is the eighth intra-urban bridge in Ahvaz, Khuzestan, Iran. It is the largest intra-urban cable bridge in West Asia.
Construction started in February 2006 and ended in March 2012. The bridge connects the Amaniyeh area and Takht-e Soleyman street, which are located west of the Karun river, with Zand street, which is located east of this river.
The structure is of wicker cable type. Its length is and its width is .