The à Âódà ºâÂÂKoluszki railway is a national importance railway line in Poland., connecting à Âódà º Fabryczna station with Koluszki station. Due to its character it is the main route for passenger trains passing through the city of à Âódà º. It is a crucial part of à Âódà º Cross-City Line.
One section between à Âódà º Fabryczna and Gaà Âkówek stations is exclusively used by passenger trains.
The history of the railway begins in the 19th century. The textile industry in à Âódà º started to bloom, yet the city had no convenient transportation routes for exporting the goods to other parts of Russian Empire. The closest railway station - Rokiciny, on WarsawâÂÂVienna railway - was located over away. It was clear - for further development à Âódà º needs the railway link.
In 1865, The à Âódà º Factory Railway Company (pol. Towarzystwo Drogi à »elaznej Fabryczno-à Âódzkiej) - a joint venture company of Karl Wilhelm Scheibler and Jan Bloch - was formed, and in the same year, on 30. June. Russian authorities gave the company permission to build a single track railway from à Âódà º to Koluszki, which were situated on the WarsawâÂÂVienna railway.
The construction began on 1. September and was finished on 18. November 1865. On 19. November the railway was ceremonially opened, and the freight service began to operate. One year later, due to opening of à Âódà º Fabryczna station, a regular passenger service started operating.
From 1898 to 1901 the railway received a second track - this time built with gauge, due to connection with newly built circular railway, going around the southern border of the city to connect with à Âódà º Kaliska station, located on the west side of the city. Track gauges were unified by Germans during World War I. In 1954 the railway was electrified, while a decade later a connector line, allowing trains from à Âódà º to head toward Piotrków Trybunalski without turning around in Koluszki, was built.
From 2006 to 2008 the railway line was slightly refurbished to raise the maximum operating speed to . From 2011 to 2012 the section between à Âódà º Fabryczna and à Âódà º Widzew stations was rebuilt, as the construction of cross-city tunnel commenced. The section was reopened in December 2016.
The railway is scheduled to receive an extension to the west within the cross-city tunnel, which will allow trains to travel through à Âódà º Fabryczna station toward à Âódà º Kaliska and à »abieniec stations