The New Berlin Horse Tram Company, abbreviated as NBPfG or NBPf, was a horse tram company based in Berlin. From 1877, it operated several lines from Alexanderplatz to WeiÃÂensee and Lichtenberg. During its first two years of operation, the company attempted to introduce a so-called perambulator service, a hybrid between a tram and an omnibus. In 1894, operations were taken over by the GroÃÂe Berliner Pferdeeisenbahn (GBPfE). The NBPfG was removed from the commercial register in 1900.
At the end of the 18th century, several colonies emerged between Berlin and Lichtenberg along Frankfurter Allee. These included Boxhagen on what is now Boxhagener StraÃÂe, Friedrichsberg near today's Frankfurter Allee station, Lichtenberg-Kietz along LückstraÃÂe, Rummelsburg on Lake Rummelsburg, and Neue Welt and Klein-Frankfurt near today's Frankfurter Tor. From 1870 onwards, the first tenement buildings were erected in this area and Lichtenberg. At the same time, the Hamburg entrepreneur Gustav Adolf Schön acquired the WeiÃÂensee manor. He sold approximately 38 hectares to Ernst Wilhelm Johannes Gäbler, who promoted the construction of tenement buildings.
The first transport link for both areas was the Ringbahn, which began operating in 1871. However, Friedrichsberg station (now Frankfurter Allee) did not adequately cover the area, and WeiÃÂensee station (now Greifswalder StraÃÂe) was located outside the WeiÃÂensee municipal area in then-undeveloped land. To connect the area to Berlin, the transport company Weigel established a horse-drawn omnibus line from Alexanderplatz to WeiÃÂensee on November 1, 1873.
Shortly after the horse-drawn omnibus line began operating, the growing population in both communities made the construction of more efficient horse-drawn railways appear profitable. Gäbler, as the initiator of the horse-drawn railway, received concessions from the Ministerial Building Commission on July 7 and October 30, 1875, for two lines from Alexanderplatz to WeiÃÂensee and Friedrichsberg, respectively. Since both the railway and the land in WeiÃÂensee were his property, Gäbler hoped this would facilitate renting out his apartments. The police license for the WeiÃÂensee line was granted on December 22, 1875, and on August 5, 1876, the Neue Berliner Pferdebahn-Gesellschaft (New Berlin Horse Tram Company) was founded to finance both lines. On October 25, 1876, Gäbler's heirs, following his death that year, transferred their rights to the company. The construction start date for the WeiÃÂensee line is unclear; the route was approved on December 29, 1876. The official opening occurred on January 1, 1877, with a trip to WeiÃÂensee Castle.
The perambulator operation (derived from Latin per meaning 'with' and ambulare = 'to travel'; roughly meaning deflection operation) on the line attracted significant attention, as it aimed to combine the advantages of rail (smooth running) and road (flexibility). A track was laid between the Königstor and WeiÃÂensee, with vehicles travelling on the road between Alexanderplatz and Königstor. The six cars used had a guide wheel mounted at the front left, lowered onto the rails to keep the car on track, while the other wheels remained on the road. Raising the guide wheel allowed the cars to leave the track, eliminating the need for sidings. The NBPf likely chose this system because constructing tracks in the city centre and sidings along the route was costly.
However, the âÂÂfifth wheelâ operation proved unsatisfactory. The guide wheel frequently derailed, and the rear axle wobbled, causing uneven running even on rails. Consequently, in 1877, the NBPf converted the line to conventional horse-drawn tram operation, laying tracks to Alexanderplatz and adding passing loops along the route. The deflection cars were converted and later reused as horse-drawn tram cars.
The second section of the NBPf, a horse-drawn tramway from Alexanderplatz to Frankfurter Tor, likely opened on July 18, 1878. Since the two lines were not initially connected by tracks, a separate depot was built on Kleine Frankfurter StraÃÂe. On June 1, 1879, the line was extended to the intersection of Frankfurter Allee and Proskauer StraÃÂe. At that time, negotiations were underway between the NBPf and the city of Berlin to establish a line toward Wedding, but this was not realised for several years.
On May 31, 1881, the city and the company signed an agreement approving the construction of two lines to the new central livestock and slaughterhouse northwest of Lichtenberg. The city also guaranteed NBPf operation on existing and newly constructed lines until December 31, 1909. One new line branched off from the Friedrichsberg line at ThaerstraÃÂe, running via Baltenplatz to the terminus at Forckenbeckplatz. The second route ran from Alexanderplatz via Landsberger StraÃÂe and Landsberger Allee to Petersburger StraÃÂe, then via Baltenplatz to Viehhof am Forckenbeckplatz. The southern access road via ThaerstraÃÂe and the first section of the northern route from Alexanderplatz to Landsberger Tor opened on December 15, 1881. The extension to the intersection of Landsberger Allee and Petersburger StraÃÂe followed on June 8, 1882, and the section along Petersburger StraÃÂe was completed between July 1, 1882, and March 31, 1883. The company then operated four lines. On October 24, 1883, with the opening of the first GBPfE line and a track connection between the two networks, these lines were extended further into the city centre, terminating at various points. As a result, the NBPf became Berlin's second-largest tram operator, ahead of the Berlin Horse Tramway, though its share of total traffic never exceeded seven per cent.
On August 15, 1885, a supplementary agreement, based on the 1881 agreement, allowed the NBPf to build two lines: one from Alexanderplatz to the intersection of MüllerstraÃÂe and GerichtstraÃÂe, and another from Frankfurter Allee through Boxhagener StraÃÂe to Rummelsburg, partly using GBPfE tracks. The latest construction start date was set for October 1, 1887. However, the NBPf did not proceed with the Rummelsburg line, and the Wedding line faced delays. The first 2.3-kilometer section from Alexanderplatz via MünzstraÃÂe, Rosenthaler StraÃÂe, BrunnenstraÃÂe, InvalidenstraÃÂe, and AckerstraÃÂe to GartenstraÃÂe opened on October 16, 1888. Between Rosenthaler Platz and the corner of InvalidenstraÃÂe and AckerstraÃÂe, the railway used GBPfE tracks. In the same year, an extension of the WeiÃÂensee line from GroÃÂe SeestraÃÂe via Heinersdorfer StraÃÂe to the racecourse began operation. This short section was served by a special line between WeiÃÂensee station and the racecourse during events, likely continuing until 1895.
In 1890, construction was approved for an extension from the cattle yard through Eldenaer StraÃÂe and ScheffelstraÃÂe to the centre of Lichtenberg at what is now Loeperplatz. On May 1, 1890, a new line began operating from Moritzplatz via Alexanderplatz and Viehhof to Lichtenberger DorfstraÃÂe.
The next major expansion, approved on April 7, 1892, involved three lines: from Schönhauser Tor via WeiÃÂenburger StraÃÂe to Danziger StraÃÂe, from Alexanderplatz via Prenzlauer Allee to Antonplatz in WeiÃÂensee, and from Friedrichsberg station through Lichtenberger DorfstraÃÂe to the Herzberge mental hospital. The NBPf was released from its obligation to build the Rummelsburg line, as it doubted its economic viability.
With effect from November 14, 1892, the Neue Berliner Pferdebahn came under the Prussian Light Rail Act of July 28, 1892. The Prussian Trade Regulations no longer applied, and new concessions were required from the Prussian police headquarters. Initially, the company refrained from building further lines, as network electrification was planned, necessitating new concessions. The last new lines built were the connection to Herzberge and the extension through Frankfurter Allee to the border of Friedrichsfelde at HubertusstraÃÂe. By the end of 1893, the NBPf operated nine lines.
Starting in the 1890s, the GroÃÂe Berliner Pferdeeisenbahn (Great Berlin Horse Railway) began acquiring nearby tram businesses. The NBPf, Berlin's third-largest tram company, was the first major acquisition. After the GBPfE acquired a majority stake, it moved the NBPf's administration from the depot at Kleine Frankfurter StraÃÂe 1 to the GBPfE headquarters at FriedrichstraÃÂe 218 on February 1, 1894. Management was taken over by GBPfE directors.
During this period, the NBPf launched three additional lines. On October 22, 1894, service began from Schönhauser Tor through WeiÃÂenburger StraÃÂe to the intersection of Prenzlauer Allee and Danziger StraÃÂe, used exclusively by the GBPfE, initially on the line HermannplatzâÂÂAlexanderplatzâÂÂSchönhauser TorâÂÂDanziger StraÃÂe corner Prenzlauer Allee. On December 22, 1894, the extension from Gartenplatz to the intersection of MüllerstraÃÂe and GerichtstraÃÂe, approved in 1892, followed. The final section, also approved in 1892, ran along Prenzlauer Allee to Antonplatz and was completed on December 1, 1895.
On September 10, 1895, Siemens & Halske launched Berlin's first electric tram line. The GBPfE, initially sceptical of the new system due to high investment costs, faced pressure to electrify. With the city approval agreement expiring in 1911, investments were necessary. This led to the âÂÂElectrification Agreementâ between the City of Berlin, GBPfE, and NBPf, signed on July 2, 1897, and January 19, 1898. The agreement mandated electrification of both networks by the end of 1902, the merger of the two companies, approved additional lines, and extended operations until December 31, 1919.
On January 25, 1898, the GroÃÂe Berliner Pferdeeisenbahn became the GroÃÂe Berliner StraÃÂenbahn (GBS). On January 1, 1900, it officially took over the Neue Berliner Pferdebahn-Gesellschaft, which was removed from the commercial register on March 13, 1900. The rolling stock, including horses, was initially reused by the GBS. Between January 24, 1900, and November 3, 1901, the former NBPf lines were electrified, except for Landsberger StraÃÂe from Büschingplatz and Landsberger Allee, served by the BerlinâÂÂHohenschönhausen tram of the Continentalen Gesellschaft für elektrische Unternehmungen since October 21, 1899. In 1902, lines were assigned numbers instead of signal boards.
Despite its size, the Neue Berliner Pferdebahn was less successful than the GBPfE. High initial fares deterred the working-class population of Lichtenberg and WeiÃÂensee, leading to expenditure exceeding income in the first decade. Only after extending lines into the city centre did the income and expenditure balance. During the transition to the GBS, the company paid a substantial dividend. With the exception of the Wedding route and the tram line along what is now Karl-Marx-Allee and Frankfurter Allee, all former NBPf routes remain in operation, some with modified routes.
The NBPf lines operated from approximately 6:00 a.m. to midnight, with consistent car intervals, which increased during evening hours. As the network expanded, some routes had overlapping lines. Travel speed was around 9âÂÂ9.5 km/h, increasing after electrification.
The NBPf initially charged a partial fare of five pfennigs per kilometre, with single trips costing 10âÂÂ25 pfennigs. Children under six travelled free, and two children over six were charged one adult fare. Tenants in GäblerâÂÂs apartments were intended to receive a fare reduction, though no evidence confirms implementation.
In the summer of 1879, the NBPf attempted to abolish the partial fare on Sunday afternoons and public holidays to improve its economic situation. However, as the GBPfE maintained the partial fare and paid dividends up to 7.5 percent annually, the police headquarters and magistrate rejected the fare increase.
The WeiÃÂensee depot, located at the corner of Heinersdorfer StraÃÂe (now RennbahnstraÃÂe) and GroÃÂe SeestraÃÂe, was built between 1875 and 1877. The half-timbered building, measuring 7.80 ÃÂ 24.80 meters with a 5-meter height, had a capacity for six cars on two tracks. Initially, it likely lacked a mainline connection.
A report in the Niederbarnimer Kreisblatt on April 8, 1877, suggested a depot near WeiÃÂensee Castle for perambulator service, but this likely referred to temporary storage due to insufficient space for maintenance in the main depot. In 1883, the depot expanded by 10 parking spaces, with the hall now covering 14.83 ÃÂ 34.90 meters across four bays. In 1885, further expansions included a stable for 104 horses, an administration and residential building, a 75-meter hall roof extension, and a 10-meter extension for a workshop, smithy, and shoeing hall.
By November 1886, two additional stables were built, and another was added in March 1897, with the complex covering 10,161 square meters. The GBS used the depot for horse-drawn trams until 1901, when it was converted for electric operation. By 1902, a new carriage shed was built, the administration building was repurposed, and stables were converted into a carriage shed with an inspection pit and a locksmithâÂÂs workshop. The depot then covered 10,213 square meters, accommodating 85 cars. After the opening of GBS station 22 (now the WeiÃÂensee depot) on Bernkasteller StraÃÂe, the old depot was abandoned. Today, residential buildings occupy the site.
The depot for the Friedrichsberg horse-drawn tramway, initially independent of the WeiÃÂensee line, was operational at Kleine Frankfurter StraÃÂe 1âÂÂ2 by 1878, possibly as early as summer 1877. Until the GBPfE takeover in 1894, the NBPf administration was located here. In 1894, the depotâÂÂs floor space was 4,464 square meters. The GBS converted it for electric operation, accommodating 55 cars as GBS depot 21. After the opening of station 24 (now the Lichtenberg depot) on SiegfriedstraÃÂe in 1913, the depot closed. The Kino International cinema now stands on the site.