Between 1917 and 1930 approximately 300 km of military and industrial narrow-gauge railways were built at the gauge of and or Bosnian gauge (), built by Austria-Hungarians and Italians, intending to create a through route from Skopje and Tetovo to the Adriatic coast of Albania. None of these railways remained intact.