Nanmendou station (; Fuzhounese: ) is a transfer station of Line 1 and Line 2, also the first transfer station of the Fuzhou Metro. It is located near the junction of Wushan Road, Bayiqi Road and Gutian Road, Gulou, Fuzhou, Fujian, China. The section of Line 1 started operation on January 6, 2017, while the section of Line 2 started operation on April 26, 2019.
The station is served by Line 1 and Line 2 and is currently the only interchange on the Fuzhou Metro network. On Line 1, the station is located between Dongjiekou and Chating stations, with a headway of 5â²45â³ (towards Fuzhou South Railway Station) or 11â²30â³ (towards Sanjiangkou) during peak hours and 8â²20â³ during slack hours. On Line 2, the station is located between Xiyang and Shuibu stations with a headway of 6â²30â³ during peak hours and 8â²20â³ to 10â² during slack hours.
The station has three basement levels and currently is the only transfer station on the network, serving two metro lines. The B1 floor is the concourse floor; the north side of B2 floor is the platform level of Line 1 with an island platform, the south side of the B2 floor is the transfer hall; B3 floor is the platform level of Line 2 with an island platform.
Source: