Line D () is an under-construction line of the Prague Metro, which will serve Prague 4 and Prague 12 in the south of the Czech capital. Construction began on the first part of the line in 2022.
Construction of Line D, connecting NámÃÂstàMÃÂru with Nové Dvory area was previously intended to start in 2010. An alternative was proposed in 2012, without building a transfer station at Pankrác, and instead sharing Line C between Nádraà ¾Ã Holeà ¡ovice and Pankrác. The construction of the line was approved by the city of Prague in 2013, and was initially planned to be built between 2017 and 2022. The project involves 10.6 kilometers of track with 10 stations, connecting NámÃÂstàMÃÂru and Depo PÃÂsnice. The cost was initially estimated at least at 25 billion CZK, in 2018 the cost increased to 43 billion CZK and in 2020 to 73 billion CZK. In July 2015, the city council adopted announced that Line D would be completed as a driverless metro line.
Construction work on the Pankrác â Olbrachtova section began in 2021 and is planned to finish in 2023. Opening of Pankrác â PÃÂsnice part is planned for 2031. In addition to the phase from Pankrác to PÃÂsnice, second phase of Line D will also lead from Pankrác to NámÃÂstàMÃÂru.