my-server
← Wiki

Line 6 (Ningbo Rail Transit)

The Line 6 of Ningbo Rail Transit () is a rapid transit line in Ningbo, Zhejiang. It starts from to with 23 stations in operation, spanning 39.6 km long. Construction started on 28 December 2022 with total investment is 31.53 billion RMB.

Opening Timeline

Stations

All 23 stations are underground . <br>

Due to passageway directly connected 2 lines at and not opened, transfer outside the station area is required. If using following QR code channels: Ningbo Rail Transit App, WeChat Pay, Alipay,... passengers must transfer within 30 minutes once exit from one of 2 stations. For passenger using single journey ticket or other IC cards, a "Ride Ticket" can be received when swipe their cards to leave the gate, and continue to the next trip with the "Ticket". <br>

OSI: Out of System Interchange