The Line 1 of Taiyuan Metro is the second metro line in Taiyuan. The line opened on February 22, 2025.
Phase 1 of Line 1 runs from in the northwest to in the southeast and has 24 stations. Phase 2 includes Wusu 3Hao Hangzhanlou station, the station will be constructed together with the terminal 3 of Wusu Airport.
Line 1 began construction in December 2019.
In phase 1, it has a total length of 28.737 km, 24 stations and 2 depots.
The length of phase 2 is 1.85km. It only has 1 station to connect new termianl 3 of Wusu Airport.