Line 1 of the Shijiazhuang Metro () is a rapid transit line in Shijiazhuang, Hebei province, China. Currently it is long with 26 stations. The line opened on 26 June 2017.
Phase 1 of the line began construction on 1 July 2013 and began service on 26 June 2017, completed at a cost of ÃÂ¥18.892 billion.
The Phase II of Line 1 is with 8 stations. Only 6 stations from Xiaohedadao to Fuze (10.4 km) opened on 26 June 2019.
Two more stations, Dongshangze and Dongyang will open later. The section is 3.1 km in length with 2 stations. The section will open in 2024.
The Phase 3 will add two more stations (Huai'anlu and Shangzhuang) in Southwest of the line. The extension is under planning.
Services are provided by CRRC Tangshan Type A rolling stock, which are operated in six-car sets that hold up to 2520 passengers each.