Line 13 of the Shenzhen Metro is one of the four new operational metro lines of the metro's Phase IV expansion in the city of Shenzhen, Guangdong. The line first opened on 28 December 2024.
The 6.36km Phase 1 South section between Shenzhen Bay Checkpoint and Hi-Tech Central opened on 28 December 2024. The Phase 1 North section (except Xili High Speed Railway Station) entered service on 28 December 2025 at 10:18 am, connecting Hi-Tech North to Shangwu (execpt Xili High Speed Railway Station). Phase 2 is expected to open in 2026 and Xili High Speed Railway Station is expected to open in 2027. The first phase of the line is long and uses eight car type A trains with a maximum operating speed of .
Like Line 4, Line 13 is operated by MTR Corporation (Shenzhen).