The Lakeside EfW is located in Colnbrook, Slough. It incinerates residual waste, and since 2010 it has also been authorised to incinerate low-level radioactive waste.
The Lakeside EfW is run by Lakeside Energy from Waste Ltd, which is a joint venture between Grundon Waste Management and Viridor. The energy-from-waste facility was established at a cost of ã160 million and was officially opened by the Duke of Edinburgh on 27 October 2010.
It is capable of processing 410,000 tonnes of residual waste annually and generating 37MW of electricity, enough to power the borough of Slough.
In 2014, expansion plans for London's Heathrow Airport suggested that the super incinerator would need to be relocated to make way for a new runway.