The BeijingâÂÂGuangzhou railway or Jingguang railway () is a major trunk railway that connects Beijing in the north with Guangzhou in the south. This double-track electrified line has a total length of and spans five provinces through north, central and south China. The line passes through the capitals of each of them: Shijiazhuang (Hebei), Zhengzhou (Henan), Wuhan (Hubei), Changsha (Hunan) and Guangzhou (Guangdong). The line's two terminals are the Beijing West railway station and the Guangzhou railway station.
Due to abundance of large and medium-sized cities on its route, this railway is widely recognized as the most important conventional railway line in China.
The Jingguang railway was originally two independent companies: the BeijingâÂÂHankou railway in the north from Beijing to Hankou, and the GuangdongâÂÂHankou railway in the south from Wuchang to Guangzhou. Hankou and Wuchang were cities on opposite sides of the Yangtze River that became part of the present city of Wuhan in 1927.
The long BeijingâÂÂHankou railway (Jinghan railway) was built between 1897 and 1906. The concession was originally awarded to a Belgian company that was backed by French investors. A strong desire to bring the route under Chinese control led to the formation of the Bank of Communications to secure the financing needed to repatriate the railway. The successful redemption of the railway in 1909 enhanced the prestige of the Communications Clique, which became a powerful political force in the early Republic.
Construction of the GuangdongâÂÂHankou railway (Yuehan railway) began in 1900 and progressed more slowly. The concession was originally awarded to the American China Development Company, but a diplomatic crisis erupted when the Belgians purchased a controlling interest in it. The concession was cancelled in 1904 to prevent Franco-Belgian interests from controlling the entire BeijingâÂÂGuangdong route. The GuangzhouâÂÂSanshui branch line was completed in 1904. The ChangshaâÂÂZhuzhou section was then completed in 1911, followed by the GuangzhouâÂÂShaoguan section in 1916, and the WuchangâÂÂChangsha section in 1918. Work on the final section between Zhuzhou and Shaoguan began in 1929 but was not completed until 1936.
On 7 February 1923, workers of the Beijing-Wuhan Railway Workers' association launched a massive strike demanding better workers' rights and protesting oppression by warlords. The strike, organized by Shi Yang and Lin Xiangqian, was an early example of worker mobilization by the Chinese Communist Party.
In March 1937, the two lines were indirectly interconnected through the railway ferry on the Yangtze River, thus enabling the service of railway services between Guangzhou and Beijing. On 15 October 1957, Wuhan Yangtze River Bridge was completed, and the two lines could be directly connected to form a merged line system until now.
The line was electrified in segments between 1992 and 2001
From north to south:
Currently, the BeijingâÂÂKowloon "Jingjiu" through train operates on this line. Prior to 2003, this train called at stops along the route, before border controls were set up at Beijing, which made the compartments to Kowloon sterile, making the intermediate stops available for use only for domestic passengers in separate carriages attached at Guangzhou East Station.
The BeijingâÂÂKowloon railway, completed in 1996, is another conventional railway connecting Beijing with the Pearl River Delta. It runs mostly within a corridor to the east of the BeijingâÂÂGuangzhou railway.
The BeijingâÂÂGuangzhou high-speed railway runs through the same major cities as the original railway, on a slightly different route that avoids built-up areas and has a greater curve radius allowing for higher speeds and a somewhat shorter overall length. In most cities along the line, the high-speed trains stop at different, purpose-built stations, rather than the older stations served by the original line. The WuhanâÂÂGuangzhou section of the high-speed railway opened in 2009, and the BeijingâÂÂWuhan section in 2012.
As consecutive sections of the BeijingâÂÂGuangzhou high-speed railway became operational, the railway authorities shifted much of passenger traffic from the original railway to the new high-speed line. This allowed an increase in the amount of freight volume transported over the original route. For example, according to preliminary estimates, after the entire BeijingâÂÂGuangzhou high-speed railway opens, the annual freight capacity of the northern half of the BeijingâÂÂGuangzhou railway (between its two main freight stations, Beijing's and Wuhan North railway station) would increase by 20 million tons.
On 29 June 2009, two passenger trains collided at Chenzhou station, leaving three people dead and 63 injured.