The Jingguang Expressway () is a long urban express road in Zhengzhou, Henan, China.
The expressway was constructed in two phases.
The first phase, which is from North 3rd Ring Road to South 3rd Ring Road, was opened on 28 April 2012. The northern section (North 3rd Ring RoadâÂÂZhongyuan Road) is an elevated expressway built above Shakou Road while the southern section (Zhongyuan RoadâÂÂSouth 3rd Ring Road) is mainly tunneled beneath Jingguang Road.
The second phase was finished in 2016. It is in elevated form and extends the expressway to Tianhe Road and G30 Lianhuo Expressway to the north and Zhengzhou Ring Expressway to the south.
The max speed limit is 60 km/h for the section between North 3rd Ring Road and South 3rd Ring Road, and 80 km/h for other sections.
This express road is toll-free.
Main road:
From north to south: