The JakartaâÂÂCikampek Toll Road () or jalan tol Japek toll road is a controlled-access toll road in Indonesia that was inaugurated in 1988. A part of the Trans-Java Toll Road network, the highway links Jakarta with cities to its east in the province of West Java. Its 36.84 kilometer-long CikunirâÂÂWest Karawang section overlaps with the Sheikh Mohammed bin Zayed Skyway.
JakartaâÂÂCikampek Toll Road was inaugurated in 1988, linking Jakarta, Bekasi, Bekasi Regency, Karawang Regency, and Purwakarta Regency.
Since 2005, this toll road also connects Bandung and Jakarta via the separate Cipularang Toll Road; the interchange to Bandung was built before the Kalihurip exit. This toll road is also part of AH2. The toll road is operated by PT Jasa Marga Tbk. In June 2015, the CikopoâÂÂPalimanan Toll Road was opened, which means Jakarta and Cirebon are now connected via toll roads. An elevated toll road is built to reduce congestion of this toll road.
After the closure of Cikarang Utama Toll Gate on 23 May 2019, the central toll gate is relocated to Cikampek Utama (to/from Cirebon-Semarang-bound) and Kalihurip Utama (to/from PurwakartaâÂÂCileunyi Toll Road-bound).
Rest area In JakartaâÂÂCikampek
JakartaâÂÂCikampek Toll Road is nominated as the most congested highway in Indonesia, especially in the area of Cikunir JCT- Bekasi Barat (although half of the expressway is 8-lanes dual carriageway (KM0-KM37) and another half is 6 lanes (KM37-KM73). By the completion of the Jakarta-Cikampek Elevated Tollway spanning from Cikunir to West Karawang, the capacity is expanded and congestion is slightly decreasing along this stretch (another stretch after Karawang Barat eastbound is, unfortunately, more congested.)
As of 2021, the Jakarta-Cikampek toll road is surrounded by 2 main projects which are under construction : LRT Cawang-Bekasi Timur (north section, KM0-KM18, under construction) and Jakarta-Bandung High-Speed Railway (south section, KM0-KM38).
The lane management along this expressway is provided in this table.
JakartaâÂÂCikampek Toll Road is implementing full open-toll system after the demolition of Cikarang Utama Toll Gate (where the west part is open-toll while the rest is closed-toll). The toll fare for this expressway is shown in this table starting from January 17, 2020.