my-server
← Wiki Redirected from Intercity Railway Connector

Huairou–Daxing Airport intercity railway

Huairou–Daxing Airport intercity railway (), formerly known as Capital Airport–Daxing Airport intercity railway connecting line (), is a higher-speed railway line currently under construction. The speed will be 200 km/h. It will connect the Beijing Capital International Airport and Beijing Daxing International Airport when the full line is completed.

Phase 1 of the railway, which is currently under construction, will connect station in Langfang, Hebei Province) and Beijing Daxing International Airport. Phase 1 is 39.438 km, including 15.3 km in Beijing and 24.138 km in Hebei Province. Phase 1 of the railway is opened for service on 28 December 2024.

The second phase from Langfang East railway station to Huairou South railway station via Capital Airport is under planning.

Stations

Phase 1

Phase 1 of the railway (Daxing Airport to Langfang East) is shared with the Langzhuo (Langfang–Zhuozhou) intercity railway (Chinese: 廊涿城际铁路).

Phase 2 (under planning)

The Phase 2 of the railway will be replaced by New Town Link Line (S6) of Beijing Subway and the stations on the line have not announced.

Notes

References