Greater Copenhagen Light Rail

Greater Copenhagen Light Rail () is a light rail system which when fully operational will connect with six S-train lines in Greater Copenhagen, Denmark, parallel to but outside the borders of Copenhagen Municipality. Its first stage is known as the Ring 3 Light Rail, for which construction started in 2018. It will go from Lundtofte, north of Copenhagen to Ishøj station in the southwest, with a projected annual ridership of 13-14 million. The southern section, from Ishøj to Rødovre Nord, with 12 stations, opened on 26 October 2025, while the northern section to Lundtofte, comprising 17 stations, is expected to open in the summer of 2026.

The line is owned by the Ringby-Letbanesamarbejdet (Ring city-Light rail cooperation), which is a collaboration between the municipalities serviced or affected by the line.

Background

The rapid transit network of greater Copenhagen consists of a metro system serving the city centre, south-eastern suburbs and one western suburb, and a well-developed S-train network consisting of radial lines and one inner ring line relatively close to the city centre. Further from the city centre, transport between the radials consists of bus lines. Since the suburbs along the radials were expected to grow, a better quality public transport solution between them was thought to be needed. Furthermore, some high passenger volume destinations such as the Technical University and two hospitals were not yet directly accessible through rail transit.

Procurement for the project was structured into five civil works packages and three packages covering equipment, operations, and maintenance. In 2018, Danish construction companies MJ Eriksson, Per Aarsleff, and CG Jensen were awarded the civil works contracts, with CG Jensen additionally commissioned to construct the line’s operations control and maintenance centre.

The transport systems contract, covering both railway infrastructure and rolling stock, was awarded to a consortium comprising Siemens and Aarsleff Rail. Siemens was contracted to deliver a turnkey solution involving electrification, signalling, communications, workshop equipment as well as overall management of the project. A 15 year operations and maintenance contract was awarded to Metro Service, a subsidiary of ATM Milano, which also operates the Copenhagen Metro.

Ridership is expected to reach 14.7 million passengers per year by 2030.

Services

Trains will depart every 5 minutes from both terminals, and every 10 minutes on evenings, Sundays and public holidays. The trip between the terminals will be completed in 58 minutes.

Since the southern section opened on 26 October 2025, trains are operating at 10 minute intervals. This will be reduced to 5 minutes when the 15 km northern section to Lundtofte opens in summer 2026.

Stations

In total the line will have 29 stations, six of which will have a connection to the S-train network.

Rolling stock

In February 2018, 29 Siemens Avenio 4-car low floor trams (27 base order and 2 options) were ordered. The contract includes options for up to 30 trams and maintenance of the trams for 15 years. The trams are light green, distinguishing them as a new and "eco-friendly" mode of transport. The trams have 6 x 100W motors and weigh approximately 48 tonnes each. They have a capacity of 258, including 64 seats. The entrance height is 350 mm above the rail. The trams are 36.9 m in length and 2.65 m wide. They are equipped with LCD information screens. They were built at the Siemens factory in Kragujevac, Serbia. They were tested at the Siemens Wegberg-Wildenrath Test and Validation Centre and the depot, where they are maintained, in Glostrup.

The trams have step-free boarding and level-access inside, with 4 areas for bicycles, pushchairs and wheelchairs.

Financing and ownership

The line is be owned through the Ringby-Light rail cooperation by the Ministry of Transport, Capital Region of Denmark and the municipalities of Lyngby-Taarbæk, Gladsaxe, Herlev, Albertslund (no station;in Glostrup, bordering Albertslund), Rødovre, Glostrup, Brøndby, Hvidovre (no station), Vallensbæk, Ishøj and Høje-Taastrup (no station). The Danish state will contribute 40% to the construction, the municipalities 34% and the Capital Region of Denmark will contribute 26%.

Originally estimated to cost 6.2 billion kr. and later 8.2 billion kr. in 2022, the final cost is expected to be 9.6 billion kr. ($1.48 billion).

Further extensions

Possible extensions beyond the Ring 3 line have been examined in official planning studies. Preparatory material for the Ring 3 project referred to a possible second stage from Park Allé to Brøndby Strand and Avedøre Holme.

In 2013, the Capital Region of Denmark analysed possible light-rail links between Glostrup Station and Copenhagen Airport. The study considered a southern corridor via Avedøre Holme, Ørestad Station and Løjtegårdsvej, a northern corridor via Hvidovre Hospital, Ny Ellebjerg and Bella Center, and a possible first stage of the northern corridor between Glostrup Station and Ny Ellebjerg.

In 2018, a separate study by the Copenhagen Municipality examined a possible light-rail corridor from Nørrebro Station to Gladsaxe Trafikplads via Tingbjerg and Frederikssundsvej, intended to improve links between the M3 City Circle line and the Ring 3 light rail.

In 2021, following a decision by the Regional Council of the Capital Region, Metroselskabet prepared a screening-level analysis of five possible extensions: Lundtofte-Nærum Station, Lundtofte-Gammel Holte, Lundtofte-Kokkedal Station, Gladsaxe Trafikplads-Avedøre Holme, and Glostrup Station-Avedøre Holme. The Glostrup Station-Avedøre Holme option was described as a branch from the Ring 3 line at Kirkebjerg via Park Allé, Brøndby Town Hall, Brøndby Stadium and Brøndby Strand Station to Avedøre Holme. For the northern corridor, the same report noted that a later branch from Hørsholm to Rungsted Kyst Station could be considered, although its economic and ridership effects were not assessed.

The 2021 analysis found that Gladsaxe Trafikplads-Avedøre Holme would generate the largest increase in light-rail boardings, while Lundtofte-Kokkedal Station would have the highest forecast ridership among the northern options.