The Gujarat Hybrid Renewable Energy Park or Khavda Solar Park is a renewable energy park under construction near Vighakot village in Kutch district of Gujarat, India. Slated to be the world's largest hybrid renewable energy park, it is being built on of waste land. It is expected to generate 30 gigawatts (GW) from solar panels and wind turbines, enough to power 18 million Indian homes. 1 GW capacity was commissioned in March 2024.
The Power Grid Corporation of India will manage the electric power transmission. The park is expected to generate 100,000 jobs and attract an investment of . It also accounts for 5 crore tonnes carbon emission reductions each year. The government also has plans to install 14 GWh grid-scale battery storage system.
The Ministry of Power plans to spend to build infrastructure to move 7 gigawatt from the park.
The proposal of the park was approved by the Government of Gujarat on 9 September 2020, allocating of land. The proposal had mentioned total 41.5 gigawatt capacity. The foundation stone of the project was laid on 15 December 2020 by Indian Prime Minister Narendra Modi. The 30-km road leading to park was constructed. In March 2024, AGEL commissioned 1 GW capacity which needed the installation of 2.4 million photovoltaic modules. AGEL had secured funding for the construction 2.1 GW capacity. GIPCL's 600 MW capacity is under construction. The first 250 MW wind power came online in July 2024. In August 2025, NTPC Green commissioned 212.5 MW capacity.