Rheinland-Pfalz (F225) is the fourth ship of the s of the German Navy.
Rheinland-Pfalz was designed and constructed by ARGE F125, a joint-venture of Thyssen-Krupp and Lürssen. She is part of the have the highest displacement of any class of frigate worldwide and are used to replace the .
Rheinland-Pfalz was laid down on 29 January 2015 and launched on 24 May 2017 in Hamburg. She was delivered to the German Navy in January 2022 and commissioned into service on 13 July of that year.