First Solar, Inc. is a publicly traded American manufacturer of solar panels. First Solar uses rigid thin-film modules for its solar panels, and produces CdTe panels using cadmium telluride (CdTe) as a semiconductor. The predecessor company, Solar Cells, Inc., was founded in 1990 by inventor Harold McMaster. In 1999, Solar Cells, Inc., was purchased by True North Partners, LLC, led by Michael Ahearn, and rebranded as First Solar, Inc.
The company went public in 2006, trading on the NASDAQ as FSLR. It has been listed on the Photovoltaik Global 30 Index since the beginning of this stock index in 2009. Its current chief executive is Mark Widmar, who succeeded the previous CEO, James Hughes, on July 1, 2016.
First Solar operates three manufacturing facilities in Ohio, one in Alabama, and one in Louisiana. As of March 2026, the company had approximately 14 GW of annual domestic nameplate capacity. The company expects to open a sixth domestic facility, a finishing facility, in South Carolina in the second half of 2026. When this facility is fully ramped in 2027, the company expects to have more than 17 GW of annual domestic nameplate capacity.
First Solar manufactures cadmium telluride (CdTe)-based photovoltaic (PV) modules, which produce electricity with a thin film CdTe semiconductor. This technology provides superior performance in degradation rate, temperature coefficient, spectral response, and shading response. At each First Solar manufacturing facility, a vertically integrated, continuous process enables full quality control under one roof, converting a sheet of glass into a fully functional solar panel in approximately four hours. First SolarâÂÂs manufacturing process uses 98 percent less semiconductor material than traditional crystalline silicon solar panels and yields the lowest carbon footprint, lowest water footprint, and fastest energy payback time in the industry.
In 2013, the company produced CdTe-panels with an efficiency of about 14 percent at a reported cost of 59 cents per watt. In August 2019, researchers from NREL and First Solar published a Nature Energy article demonstrating a way to achieve 20.8% solar cell efficiency. Currently, Series 7 TR1 modules, with an efficiency rating of up to 19.7%, represent topline efficiency among First Solar's module lineup.
First SolarâÂÂs CuRe technology, currently incorporated into its Series 6 Plus V2 modules, provides an industry-best warranted annual degradation rate of 0.1%.
The company has invested a cumulative $2 billion + in the research and development of its technology.
Current solar module lineup
In 1984, inventor and entrepreneur Harold McMaster founded Glasstech Solar. After conducting research on amorphous silicon, he shifted to CdTe and founded Solar Cells, Inc. (SCI) in 1990. In February 1999, SCI was acquired by True North Partners, which then formed FirstÃÂ Solar,ÃÂ LLC.
The company is headquartered in Phoenix, Arizona, and has manufacturing facilities in Perrysburg, Ohio; Trinity, Alabama; New Iberia, Louisiana; Kulim, Malaysia; Ho Chi Minh City, Vietnam; and Chennai, India. It expects to open a finishing facility in Gaffney, South Carolina, in the second half of 2026.
At the end of 2009, First Solar had surpassed an energy power production rate of 1 GW and was the largest producer of PV cells in the world. That same year, First Solar became the first solar panel manufacturing company to lower its manufacturing cost to $1 per watt.
In July 2010, First Solar formed a utility systems business group to address the large-scale PV systems solutions market. Providing solar modules for utility-scale PV systems is now the company's core business focus, with a strategy to focus on markets that do not require subsidies to support the solar generation business.
On April 17, 2012, First Solar announced it would restructure operations worldwide. This restructuring process included phasing out operations in Frankfurt (Oder), Germany and idling four production lines in Kulim, Malaysia. Approximately 30% of First Solar's workforce was laid off as a result of these actions, which were blamed on market volatility and reduced demand. Mark Widmar, then the CFO of First Solar, said, "We need to resize our business to a level of demand that is highly reliable and predictable."
On July 1, 2016, Mark Widmar was appointed CEO of First Solar. Previously he had been chief financial officer. Former CEO Mike Ahearn remains chairman of the board.
In 2022, under the Inflation Reduction Act, First Solar became perhaps the biggest beneficiary of an estimated $1 trillion in environmental spending. First Solar executives and lobbyists met at least four times in late 2022 and 2023 with administration officials who oversaw the measureâÂÂs environmental provisions. Democratic donors had invested heavily in the company prior to the act being signed into law.
In May 2023, First Solar acquired Evolar, a European company that provided perovskite technology. The deal was valued at $38M USD.
First Solar has a policy of zero tolerance for forced labor in its operations and supply chain. It works to ensure that it does not source components from Xinjiang, China, (a region known for forced labor) or from entities on the UFLPA Entity List.
The company regularly conducts independent third-party, on-site social audits across its global manufacturing footprint. In 2022, an audit of the company's Malaysian factory found that four ancillary providers of janitorial, warehouse, and security services fell short of its standards and had subjected foreign migrant workers to unethical recruitment. First Solar disclosed the findings to raise awareness about modern slavery risks and worked with the ancillary service providers to ensure the recruitment fees were reimbursed to the affected workers.
In the 2023 Renewable Energy & Human Rights Benchmark report by the Business & Human Rights Resource Centre (BHRRC), First Solar was the only PV manufacturer with no ties to state-sponsored forced labor.
In 2024, First Solar commissioned a new research and development (R&D) innovation center in Lake Township, Ohio, which is believed to be the largest facility of its kind in the Western Hemisphere. The 1.3 million square-foot Jim Nolan Center for Solar Innovation is dedicated to the late James âÂÂJimâ F. Nolan, a former member of First SolarâÂÂs Board of Directors and the architect of the companyâÂÂs CdTe semiconductor platform.
Historically, First Solar sold its products to solar project developers, system integrators, and independent power producers. Early sales were primarily in Germany because of strong incentives for solar enacted in the German Renewable Energy Sources Act (EEG) of 2000 (cp. Solar power in Germany). Declines and uncertainty in feed-in-tariff subsidies for solar power in European markets, including Germany, France, Italy and Spain, prompted major PV manufacturers, such as First Solar, to accelerate their expansion into other markets, including the U.S., India and China.
Beginning in December 2011, First Solar shifted away from existing markets that are heavily dependent on government subsidies and toward providing utility-scale PV systems in sustainable markets with immediate need. As a result, it began competing against conventional power generators, and reduced its focus on the rooftop market.
On February 24, 2009, First Solar's cost per watt broke $1 reaching $0.98. In 2023, the company sold 11.4 GW of solar modules. Production costs of 18.8 cents/watt were forecast in February 2024, with average sales prices of 18.2 cent/kWh for sales of around 16 GW in 2024. In 2024, the company sold a record 14.1 GW of solar modules.
First Solar sold $857 million in Inflation Reduction Act transferable tax credits generated from its U.S.-based manufacturing facilities in February 2025. The tax credits were from the sale of solar modules produced in 2024 at First SolarâÂÂs U.S. manufacturing facilities, including three factories in Ohio and a new Alabama facility.
Commercial production started in Perrysburg, Ohio, in 2002. Between 2007 and 2012, production grew with additional plants in Frankfurt (Oder) in Germany; and Kulim Hi-Tech Park in Malaysia. The German factories are no longer in operation. Other locations considered for expansions before 2012 included Mesa, Arizona. International expansion has also included new factories in Ho Chim Minh City, Vietnam (commissioned in 2018) and Tamil Nadu, India (2024). Two new manufacturing facilities were commissioned in Ohio (in 2019 and 2023). A new manufacturing facility was commission in Trinity, Alabama, in 2024, followed by a new facility in New Iberia, Louisiana, in 2025. A new finishing facility is expected to open in Gaffney, South Carolina, in the second half of 2026.
First Solar's 2024 Sustainability Report highlights findings related to Environmental, Social, and Governance (ESG) metrics, including modern slavery and forced labor findings. Report findings shared with media support the company's proactive efforts and due diligence to address human right violations within the solar power supply chain as they are discovered. First Solar's products have been released by U.S. Customs and Border Protection and comply with the Uyghur Forced Labor Prevention Act.
While First Solar witnessed record sales of over $3.37 billion in 2012, its restructuring efforts impacted the bottom line, leading to a net loss of $96.3 million â or $1.11 per share â for the year.
Historically, the low cost of First Solar's modules has been the key to its market performance. The use of cadmium telluride instead of silicon allowed it to achieve a significantly lower module cost ($0.67 per watt), compared to crystalline-silicon PV, which averaged $1.85 per watt in 2010.
As the company shifts its focus away from module sales to utility-scale projects, it will need to become price competitive with non-solar power sources, a move which its executives say will require the company to reduce manufacturing costs and optimize efficiency.
First Solar had installed 1,505 megawatt (1.5 gigawatt) of solar capacity as of 2012. As of 2019, First Solar has over 17 gigawatt deployed globally. Below are some of First Solar's solar installations and development projects: