The Chengjiao line of the Zhengzhou Metro (), planned to be part of Line 9 in the future, is a rapid transit line in Zhengzhou. It was opened on 12 January 2017. This line is long with 19 stations (16 stations in operation).
Through services are operated on Line 2 and Chengjiao line, although they are classified as separate lines.