Motorways in Serbia are called auto-put (), a name which simply means car-road. Roads that are motorways are categorized as state roads of IA category and are marked with one or two digit numbers. Motorways in Serbia have three lanes in each direction (including hard shoulder), signs are white-on-green, and the normal speed limit is (since June 2018). They are maintained and operated by the national road operator company JP "Putevi Srbije" ("Roads of Serbia").
As of December 2025, there are of motorways in service (excluding Kosovo).
As the Serbian word for motorway is "autoput", the "A1", "A2", "A3", "A4" and "A5" road designations are used since 2013. After a revision in October 2023, 4 new motorway signs have been added: "A6", "A7", "A8" and "A9".
A1 runs from the Horgoà ¡ border crossing with Hungary near Subotica, passing Novi Sad, Belgrade (A3 and A2 junction), Pojate near Kruà ¡evac (A5 junction), Nià ¡ (A4 junction), Leskovac and Vranje and eventually ends at the Preà ¡evo border crossing with North Macedonia. This motorway is part of European route E75.
A2 is a motorway under construction that will link Belgrade with Bosnia and Herzegovina and Montenegro. The route passes Obrenovac, ÃÂaÃÂak, Poà ¾ega, Uà ¾ice and ends at Kotroman (at the border with Bosnia and Herzegovina), and ends at Boljare (at the border with Montenegro).
As of 2025, the PakovraÃÂe - Poà ¾ega section has been completed, with Poà ¾ega - Boljare section in planning.
A3 is runs from Batrovci border crossing with Croatia, passing Sremska Mitrovica and Ruma and ends at Dobanovci interchange near Belgrade.
A4 is a motorway that connects the A1 motorway near Nià ¡ to Gradina border crossing with Bulgaria, part of European route E80.
A5 is a motorway under construction that will link A1 with A2. The route starts at Pojate interchange near ÃÂiÃÂevac, passes Kruà ¡evac and Kraljevo and ends at Preljina interchange near ÃÂaÃÂak. Construction of this stretch started in December 2019.
A8 is a motorway that links the A3 motorway with à  abac-Loznica expressway. The route starts at the interchange near Ruma, passes Hrtkovci and ends near à  abac.
Over 300 kilometers of new motorways have been constructed in the last decade and an additional are currently under construction including: a long segment of A5 (from Pojate to Preljina); an section between Kuzmin and Sremska RaÃÂa.