The Akanyaru Multipurpose Dam, is a planned dam across the Akanyaru River, at the international border between Rwanda and Burundi. The dam will create a reservoir with storage capacity of . The water is expected to supply drinking water to an estimated 614,200 people in both countries. The reservoir is also expected to provide irrigation water to an estimated of agricultural land in Burundi and Rwanda, benefitting an estimated 24,948 farmers. The dam will also host Akanyaru Hydroelectric Power Station, with generating capacity of .

Location

The power station would be on the Akanyaru River, along Rwanda's border with Burundi, in present-day Gisagara District in Southern Province, Rwanda and in Commune of Ntega in Kirundo Province, Burundi.

The dam is approximately , by road, southwest of Kigali, the capital city of Rwanda. This is about , by road, north of Gitega, the capital city of Burundi.

History

In 2012, the two East African countries and the Nile Equatorial Lakes Subsidiary Action Program (NELSAP), identified the Akanyaru Multipurpose Water Resources Development Project. That year, NELSAP carried out pre-feasibility studies.

In 2015, the Nile Council of Ministers approved the Akanyaru Project. Delegations from Rwanda and Burundi appraised the project site in May 2016. In March 2018, NELSAP prepared a full funding proposal to the African Development Bank (AfDB). In 2020, tenders were floated for full Environmental and social impact assessment (ESIA) studies, Resettlement Action Plan (RAP), full feasibility studies, detailed design and preparation of tender documents for the project were initiated. Project studies are expected to conclude in March 2022.

Funding

In February 2021, the project cost was calculated at US$190 million. Loan application was made to the AfDB, under its NEPAD Infrastructure Project Preparation Facility (NEPAD-IPPF).

Other considerations

The proposed Akanyaru Hydroelectric Power Station, is expected to supply electricity to 141,111 homes in both countries, serving an estimated 846,000 people. The project also involves the restoration of degraded watersheds upstream of the Akanyaru Dam.