The A8 motorway (), also known as The Union Motorway () or the East-West Motorway () is a planned motorway in Romania, that will cross the Eastern Carpathians to connect the historical regions of Moldavia and Transylvania. It will directly link the cities of IaÃÂi and Târgu MureÃÂ. The A8 motorway route is an integral part of the Trans-European Transport (TEN-T) Core Network.
As of May 2025, five sections are under design and construction, while all of the remaining sections are tendered.
Early plans estimated the first opening as early as 2009. With a total length of around , and an estimated cost of 4.07 billion â¬, the motorway will begin from the junction with the A3 motorway near Târgu MureÃÂ, and will run through Sovata, DitrÃÂu, Târgu NeamÃÂ, PaÃÂcani, Târgu Frumos and IaÃÂi. At its eastern end, the motorway will cross the Prut river at Ungheni to reach Moldova's R1 highway, which further heads east towards ChiÃÂinÃÂu.
The A8 motorway is divided into five segments: Târgu Mureàâ DitrÃÂu segment of , DitrÃÂu â junction with DN2 segment of , DN2 â IaÃÂi segment of , IaÃÂi Nord bypass segment of , and IaÃÂi â Ungheni border segment ().
Pre-feasibility studies performed in 2007 were followed by feasibility studies in 2009âÂÂ2011. As of February 2015, the feasibility study revision and update is being conducted by private contractors. The auction for the execution of the Târgu Mureà- Târgu Neamàsegments was expected to be launched in 2021.
The tenders for two sections (Section 1 - : Târgu Mureà- Miercurea Nirajului, and Section 3 - : Leghin â Târgu NeamÃÂ) were set to be submitted by 27 February 2023 and 28 February 2023 respectively. On 20 September 2023, the contract for the design and execution of the Leghin â Târgu Neamàsection (between VânÃÂtori-Neamàand Boureni (junction with DN2)) was signed with the SA&PE Construct-Spedition UMB-Tehnostrade association. In February 2024, the contract for the design and execution of the Târgu Mureà- Miercurea Nirajului section was signed with Nurol. The duration of the contracts are 30 months long, 6 months for planning and 24 months for the execution.
The tender for the design and execution of section 1B Miercurea Nirajului - SÃÂrÃÂÃÂeni () was to be submitted by 22 May 2024, and by 25 June 2024 for section 2C Pipirig â Leghin (). As of January 2025, four other sections, 1C SÃÂrÃÂÃÂeni - Joseni (), 1D Joseni - DitrÃÂu (), 2A DitrÃÂu - GrinÃÂieà(), and 2B GrinÃÂieà- Pipirig () were also under tender.
In March 2025, the contract for the design and execution of the DitrÃÂu - GrinÃÂieÃÂ section (2A) was signed with the SA&PE Construct-Tehnostrade-Euro Asfalt-Spedition UMB association. The duration of the contract is 54 months long, 14 months for planning and 40 months for the execution.
Until the end of May 2025, two more contracts were signed for the sections 2C Pipirig - Leghin, and 1B Miercurea Nirajului - SÃÂrÃÂÃÂeni.